    School Name: Acceleration East School Type: High Project Type: Capital Renewal Status: Closeout Year: 2021 Attachments: 
 School Name: Acceleration East School Type: High Project Type: New/Relief Status: Complete Year: 2002 Attachments: 
- 
        
    School Name: Acceleration West School Type: High Project Type: Comprehensive Renovation Status: Complete Year: 2020 Attachments: 
- 
        
    School Name: Aloma ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2012 Attachments: 
- 
        
    School Name: Andover ES School Type: Elementary Project Type: Capital Renewal Status: Design Year: 2023 Attachments: 
 School Name: Andover ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2005 Attachments: 
- 
        
    School Name: Apopka 9th Grade Center School Type: High Project Type: Capital Renewal Status: Complete Year: 2021 Attachments: 
- 
        
    School Name: Apopka ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2015 Attachments: 
 School Name: Apopka ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: Apopka MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2011 Attachments: 
- 
        
    School Name: Apopka HS School Type: High Project Type: Capital Renewal Status: Planning Year: 2023 Attachments: 
 School Name: Apopka HS School Type: High Project Type: Replacement Status: Complete Year: 2009 Attachments: 
- 
        
    School Name: Arbor Ridge K-8 School Type: Middle/K-8 Project Type: Capital Renewal Status: Construction Year: 2023 Attachments: 
 School Name: Arbor Ridge K-8 School Type: Middle/K-8 Project Type: Replacement Status: Complete Year: 2013 Attachments: 
- 
        
    School Name: Atwater Bay Elementary (Site 47-E-W-4) School Type: Elementary Project Type: New/Relief Status: Construction Year: 2024 Attachments: 
- 
        
    School Name: Audubon Park School Type: Middle/K-8 Project Type: New/Relief Status: Complete Year: 2018 Attachments: 
- 
        
    School Name: Audubon Park School School Type: Middle/K-8 Project Type: New/Relief Status: Complete Year: 2018 Attachments: 
- 
        
    School Name: Avalon Center for Technical Excellence School Type: Vocational/Other Project Type: New/Relief Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: Avalon ES School Type: Elementary Project Type: Comprehensive Renovation Status: Design Year: 2026 Attachments: 
 School Name: Avalon ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2001 Attachments: 
- 
        
    School Name: Avalon MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Construction Year: 2023 Attachments: 
 School Name: Avalon MS School Type: Middle/K-8 Project Type: New/Relief Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Azalea Park ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2011 Attachments: 
- 
        
    School Name: Baldwin Park ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: Bay Lake ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2016 Attachments: 
- 
        
    School Name: Bay Meadows ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Blankner School School Type: Middle/K-8 Project Type: Capital Renewal Status: Construction Year: 2021 Attachments: 
 School Name: Blankner School School Type: Middle/K-8 Project Type: Replacement Status: Complete Year: 2002 Attachments: 
- 
        
    School Name: Bonneville ES School Type: Elementary Project Type: Capital Renewal Status: Design Year: 2023 Attachments: 
 School Name: Bonneville ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: Boone High School Type: High Project Type: Comprehensive Renovation Status: Planning Year: 2027 Attachments: 
 School Name: Boone HS School Type: High Project Type: Capital Renewal Status: Closeout Year: 2022 Attachments: - Building 700, 800 improvements Final Update
- CEP Relocation Closeout Update
- Campuswide Final Update
- 500 Building Final Update
 
 School Name: Boone HS School Type: High Project Type: Capital Renewal Status: Complete Year: 2020 Attachments: 
 School Name: Boone HS School Type: High Project Type: Replacement Status: Complete Year: 2020 Attachments: 
 School Name: Boone HS School Type: High Project Type: Comprehensive Renovation Status: Complete Year: 2020 Attachments: 
 School Name: Boone HS School Type: High Project Type: Replacement Status: Complete Year: 2019 Attachments: 
 School Name: Boone HS School Type: High Project Type: Comprehensive Renovation Status: Complete Year: 2004 Attachments: 
- 
        
    School Name: Bridgewater MS School Type: Middle/K-8 Project Type: New/Relief Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: Brookshire ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2013 Attachments: 
- 
        
    School Name: Camelot ES School Type: Elementary Project Type: Comprehensive Renovation Status: Design Year: 2026 Attachments: 
 School Name: Camelot ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2001 Attachments: 
- 
        
    School Name: Carver MS School Type: Middle/K-8 Project Type: Replacement Status: Complete Year: 2017 Attachments: 
- 
        
    School Name: Castle Creek ES School Type: Elementary Project Type: Capital Renewal Status: Construction Year: 2023 Attachments: 
 School Name: Castle Creek ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Castleview ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2019 Attachments: 
- 
        
    School Name: Catalina ES School Type: Elementary Project Type: Capital Renewal Status: Construction Year: 2023 Attachments: 
 School Name: Catalina ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: Chain of Lakes MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Planning Year: 2026 Attachments: 
 School Name: Chain of Lakes MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Construction Year: 2022 Attachments: 
 School Name: Chain of Lakes MS School Type: Middle/K-8 Project Type: New/Relief Status: Complete Year: 1999 Attachments: 
- 
        
    School Name: Cheney ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Chickasaw ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2011 Attachments: 
 School Name: Chickasaw ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: Citrus ES School Type: Elementary Project Type: Comprehensive Renovation Status: Design Year: 2026 Attachments: 
 School Name: Citrus ES School Type: Elementary Project Type: Capital Renewal Status: Complete Year: 2018 Attachments: 
 School Name: Citrus ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2000 Attachments: 
- 
        
    School Name: Clay Springs ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2015 Attachments: 
- 
        
    School Name: College Park MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Design Year: 2025 Attachments: 
 School Name: College Park MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Complete Year: 2018 Attachments: 
 School Name: College Park MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2010 Attachments: 
- 
        
    School Name: Colonial HS School Type: High Project Type: Comprehensive Renovation Status: Design Year: 2026 Attachments: 
 School Name: Colonial HS School Type: High Project Type: Capital Renewal Status: Complete Year: 2019 Attachments: 
 School Name: Colonial HS School Type: High Project Type: Replacement Status: Complete Year: 2019 Attachments: 
 School Name: Colonial HS School Type: High Project Type: Comprehensive Renovation Status: Complete Year: 2003 Attachments: 
- 
        
    School Name: Colonial Ninth Grade Center School Type: High Project Type: Capital Renewal Status: Complete Year: 2020 Attachments: 
 School Name: Colonial Ninth Grade Center School Type: High Project Type: Comprehensive Renovation Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Columbia ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: Conway ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2008 Attachments: 
- 
        
    School Name: Conway MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2010 Attachments: 
- 
        
    School Name: Corner Lake MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2019 Attachments: 
- 
        
    School Name: Cypress Springs ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2012 Attachments: 
- 
        
    School Name: Deerwood ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2019 Attachments: 
- 
        
    School Name: Dillard Street ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2004 Attachments: 
- 
        
    School Name: Discovery MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Closeout Year: 2022 Attachments: 
 School Name: Discovery MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Complete Year: 2021 Attachments: 
 School Name: Discovery MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2009 Attachments: 
- 
        
    School Name: Dommerich ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2010 Attachments: 
- 
        
    School Name: Dover Shores ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2018 Attachments: 
- 
        
    School Name: Dr. Phillips ES School Type: Elementary Project Type: Comprehensive Renovation Status: Design Year: 2025 Attachments: 
 School Name: Dr. Phillips ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2014 Attachments: 
- 
        
    School Name: Dr. Phillips HS School Type: High Project Type: Capital Renewal Status: Construction Year: 2024 Attachments: 
 School Name: Dr. Phillips HS School Type: High Project Type: Capital Renewal Status: Design Year: 2022 Attachments: 
 School Name: Dr. Phillips HS School Type: High Project Type: Comprehensive Renovation Status: Complete Year: 2015 Attachments: 
- 
        
    School Name: Dream Lake ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2016 Attachments: 
- 
        
    School Name: Eagle Creek ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2015 Attachments: 
- 
        
    School Name: Eagle's Nest ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2003 Attachments: 
- 
        
    School Name: East Lake ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2005 Attachments: 
- 
        
    School Name: East River HS School Type: High Project Type: New/Relief Status: Complete Year: 2009 Attachments: 
- 
        
    School Name: Eccleston ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2013 Attachments: 
- 
        
    School Name: Edgewater HS School Type: High Project Type: Capital Renewal Status: Closeout Year: 2022 Attachments: 
 School Name: Edgewater HS School Type: High Project Type: Comprehensive Renovation Status: Complete Year: 2011 Attachments: 
- 
        
    School Name: Endeavor ES School Type: Elementary Project Type: Comprehensive Renovation Status: Design Year: 2026 Attachments: 
 School Name: Endeavor ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2000 Attachments: 
- 
        
    School Name: Engelwood ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2017 Attachments: 
- 
        
    School Name: Evans HS School Type: High Project Type: Replacement Status: Complete Year: 2012 Attachments: 
- 
        
    School Name: Forsyth Woods ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2010 Attachments: 
- 
        
    School Name: Frangus ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2018 Attachments: 
- 
        
    School Name: Freedom MS School Type: Middle/K-8 Project Type: New/Relief Status: Complete Year: 2005 Attachments: 
- 
        
    School Name: Freedom HS School Type: High Project Type: Capital Renewal Status: Complete Year: 2020 Attachments: 
 School Name: Freedom HS School Type: High Project Type: New/Relief Status: Complete Year: 2003 Attachments: 
- 
        
    School Name: Glenridge MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Closeout Year: 2022 Attachments: 
 School Name: Glenridge MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Construction Year: 2021 Attachments: 
 School Name: Glenridge MS School Type: Middle/K-8 Project Type: Replacement Status: Complete Year: 2003 Attachments: 
- 
        
    School Name: Gotha MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Complete Year: 2020 Attachments: 
 School Name: Gotha MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2010 Attachments: 
- 
        
    School Name: Hamlin ES School Type: Elementary Project Type: New/Relief Status: Construction Year: 2022 Attachments: 
- 
        
    School Name: Hamlin MS School Type: Middle/K-8 Project Type: New/Relief Status: Construction Year: 2022 Attachments: 
- 
        
    School Name: Hiawassee ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2003 Attachments: 
- 
        
    School Name: Hidden Oaks ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2018 Attachments: 
- 
        
    School Name: Hillcrest ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2018 Attachments: 
- 
        
    School Name: Horizon HS School Type: High Project Type: New/Relief Status: Closeout Year: 2021 Attachments: 
- 
        
    School Name: Horizon West MS School Type: Middle/K-8 Project Type: New/Relief Status: Complete Year: 2019 Attachments: 
- 
        
    School Name: Howard MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Construction Year: 2025 Attachments: 
 School Name: Howard MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Design Year: 2024 Attachments: 
 School Name: Howard MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2001 Attachments: 
- 
        
    School Name: Hungerford ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2018 Attachments: 
- 
        
    School Name: Hungerford ES (OTC - Eatonville) School Type: Vocational/Other Project Type: Comprehensive Renovation Status: Construction Year: 2023 Attachments: 
- 
        
    School Name: Hunter's Creek ES School Type: Elementary Project Type: Comprehensive Renovation Status: Design Year: 2025 Attachments: 
- 
        
    School Name: Hunter's Creek MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Design Year: 2025 Attachments: 
 School Name: Hunter's Creek MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2010 Attachments: 
- 
        
    School Name: Independence ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2015 Attachments: 
- 
        
    School Name: Innovation High School (Site 50-H-SE-2) School Type: High Project Type: New/Relief Status: Construction Year: 2024 Attachments: 
- 
        
    School Name: Innovation MS School Type: Middle/K-8 Project Type: New/Relief Status: Complete Year: 2017 Attachments: 
- 
        
    School Name: Ivey Lane ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2017 Attachments: 
- 
        
    School Name: John Young ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2014 Attachments: 
- 
        
    School Name: Jones HS School Type: High Project Type: Capital Renewal Status: Construction Year: 2022 Attachments: 
 School Name: Jones HS School Type: High Project Type: Comprehensive Renovation Status: Complete Year: 2005 Attachments: 
- 
        
    School Name: Keene's Crossing ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2009 Attachments: 
- 
        
    School Name: Kelly Park School School Type: Middle/K-8 Project Type: New/Relief Status: Construction Year: 2022 Attachments: 
- 
        
    School Name: Killarney ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2008 Attachments: 
- 
        
    School Name: Lake Buena Vista HS School Type: High Project Type: New/Relief Status: Closeout Year: 2021 Attachments: 
- 
        
    School Name: Lake Como School School Type: Middle/K-8 Project Type: Replacement Status: Complete Year: 2018 Attachments: 
- 
        
    School Name: Lake Gem ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2019 Attachments: 
- 
        
    School Name: Lake George ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2019 Attachments: 
- 
        
    School Name: Lake Nona HS School Type: High Project Type: New/Relief Status: Complete Year: 2009 Attachments: 
- 
        
    School Name: Lake Silver ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2014 Attachments: 
- 
        
    School Name: Lake Sybelia ES School Type: Elementary Project Type: Capital Renewal Status: Planning Year: 2021 Attachments: 
 School Name: Lake Sybelia ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2011 Attachments: 
- 
        
    School Name: Lake Weston ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2015 Attachments: 
- 
        
    School Name: Lake Whitney ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2015 Attachments: 
- 
        
    School Name: Lakemont ES School Type: Elementary Project Type: Capital Renewal Status: Planning Year: 2023 Attachments: 
 School Name: Lakemont ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2008 Attachments: 
- 
        
    School Name: Lakeview MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Design Year: 2026 Attachments: 
 School Name: Lakeview MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Construction Year: 2022 Attachments: 
 School Name: Lakeview MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2005 Attachments: 
- 
        
    School Name: Lakeville ES School Type: Elementary Project Type: Capital Renewal Status: Complete Year: 2020 Attachments: 
 School Name: Lakeville ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2010 Attachments: 
- 
        
    School Name: Lancaster ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2013 Attachments: 
- 
        
    School Name: Laureate Park ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2017 Attachments: 
- 
        
    School Name: Lawton Chiles ES School Type: Elementary Project Type: Comprehensive Renovation Status: Planning Year: 2026 Attachments: 
 School Name: Lawton Chiles ES School Type: Elementary Project Type: Capital Renewal Status: Closeout Year: 2022 Attachments: 
 School Name: Lawton Chiles ES School Type: Elementary Project Type: Capital Renewal Status: Complete Year: 2020 Attachments: 
 School Name: Lawton Chiles ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 1999 Attachments: 
- 
        
    School Name: Legacy MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Design Year: 2023 Attachments: 
 School Name: Legacy MS School Type: Middle/K-8 Project Type: New/Relief Status: Complete Year: 2005 Attachments: 
- 
        
    School Name: Liberty MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Closeout Year: 2022 Attachments: - Serving Lines Renovation Design Update
- Plumbing Planning Update
- Building Systems Update Final Update
- Chiller Close-out Update
 
 School Name: Liberty MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: Little River ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2014 Attachments: 
- 
        
    School Name: Lockhart ES School Type: Elementary Project Type: Capital Renewal Status: Complete Year: 2016 Attachments: 
- 
        
    School Name: Lockhart MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Planning Year: 2023 Attachments: 
 School Name: Lockhart MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2010 Attachments: 
- 
        
    School Name: Lovell ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2015 Attachments: 
- 
        
    School Name: Site 130-E-SE-2 School Type: Elementary Project Type: New/Relief Status: Construction Year: 2025 Attachments: 
- 
        
    School Name: Luminary Middle School (Site 129-M-SE-2) School Type: Middle/K-8 Project Type: New/Relief Status: Construction Year: 2024 Attachments: 
- 
        
    School Name: Magnolia School/Silver Pines Academy K-12 Learning Center School Type: Vocational/Other Project Type: Replacement Status: Closeout Year: 2021 Attachments: 
- 
        
    School Name: Maitland MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2010 Attachments: 
- 
        
    School Name: Maxey ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2018 Attachments: 
- 
        
    School Name: McCoy ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2005 Attachments: 
- 
        
    School Name: Meadow Woods ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2017 Attachments: 
- 
        
    School Name: Meadow Woods MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Closeout Year: 2021 Attachments: 
- 
        
    School Name: Meadowbrook MS School Type: Middle/K-8 Project Type: Replacement Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Memorial MS School Type: Middle/K-8 Project Type: Replacement Status: Complete Year: 2009 Attachments: 
- 
        
    School Name: Metrowest ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2011 Attachments: 
- 
        
    School Name: Metrowest Primary Learning Center School Type: Elementary Project Type: New/Relief Status: Complete Year: 1999 Attachments: 
- 
        
    School Name: Millennia ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Millennia Gardens ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2016 Attachments: 
- 
        
    School Name: Mollie Ray ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2017 Attachments: 
- 
        
    School Name: Moss Park ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: Northlake Park Community School School Type: Elementary Project Type: Capital Renewal Status: Complete Year: 2020 Attachments: 
 School Name: Northlake Park Community School School Type: Elementary Project Type: New/Relief Status: Complete Year: 1999 Attachments: - Final Update
 
- 
        
    School Name: Northlake Park ES School Type: Elementary Project Type: Comprehensive Renovation Status: Construction Year: 2026 Attachments: 
- 
        
    School Name: Oak Hill ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2017 Attachments: 
- 
        
    School Name: Oak Ridge HS School Type: High Project Type: Comprehensive Renovation Status: Design Year: 2025 Attachments: 
 School Name: Oak Ridge HS School Type: High Project Type: Replacement Status: Complete Year: 2013 Attachments: 
- 
        
    School Name: Oakshire ES School Type: Elementary Project Type: Comprehensive Renovation Status: Planning Year: 2026 Attachments: 
 School Name: Oakshire ES School Type: Elementary Project Type: Capital Renewal Status: Complete Year: 2020 Attachments: 
 School Name: Oakshire ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 1999 Attachments: 
- 
        
    School Name: Ocoee ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2014 Attachments: 
- 
        
    School Name: Ocoee MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Planning Year: 2025 Attachments: 
 School Name: Ocoee MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Closeout Year: 2022 Attachments: 
 School Name: Ocoee MS School Type: Middle/K-8 Project Type: Replacement Status: Complete Year: 2001 Attachments: 
- 
        
    School Name: Ocoee HS School Type: High Project Type: Capital Renewal Status: Planning Year: 2023 Attachments: 
 School Name: Ocoee HS School Type: High Project Type: New/Relief Status: Complete Year: 2005 Attachments: 
- 
        
    School Name: OCPS Academic Center for Excellence (ACE) School Type: Middle/K-8 Project Type: New/Relief Status: Complete Year: 2017 Attachments: 
- 
        
    School Name: Odyssey MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Complete Year: 2019 Attachments: 
 School Name: Odyssey MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Complete Year: 2017 Attachments: 
 School Name: Odyssey MS School Type: Middle/K-8 Project Type: New/Relief Status: Complete Year: 2001 Attachments: 
- 
        
    School Name: Olympia HS School Type: High Project Type: Comprehensive Renovation Status: Planning Year: 2027 Attachments: 
 School Name: Olympia HS School Type: High Project Type: Capital Renewal Status: Complete Year: 2020 Attachments: 
 School Name: Olympia HS School Type: High Project Type: Comprehensive Renovation Status: Complete Year: 2007 Attachments: 
 School Name: Olympia HS School Type: High Project Type: New/Relief Status: Complete Year: 2001 Attachments: 
- 
        
    School Name: Orange Center ES School Type: Elementary Project Type: Comprehensive Renovation Status: Design Year: 2023 Attachments: 
- 
        
    School Name: Orange Technical College (Formerly OTC - Orlando) School Type: Vocational/Other Project Type: Comprehensive Renovation Status: Construction Year: 2023 Attachments: 
- 
        
    School Name: Orlo Vista ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2004 Attachments: 
- 
        
    School Name: OTC - Apopka Campus (Site 204-AE-N-7) School Type: Vocational/Other Project Type: Capital Renewal Status: Design Year: 2022 Attachments: 
- 
        
    School Name: OTC - East Campus (Site 512-T-E-1) School Type: Vocational/Other Project Type: Replacement Status: Construction Year: 2024 Attachments: 
- 
        
    School Name: OTC - South Campus (Formerly Mid-Florida Tech) School Type: Vocational/Other Project Type: Comprehensive Renovation Status: Design Year: 2025 Attachments: 
- 
        
    School Name: OTC West Campus (Site 73-T-W-7) Formerly Westside Tech School Type: Vocational/Other Project Type: Replacement Status: Construction Year: 2024 Attachments: 
- 
        
    School Name: Palm Lake ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2010 Attachments: 
- 
        
    School Name: Palmetto ES School Type: Elementary Project Type: Comprehensive Renovation Status: Planning Year: 2026 Attachments: 
 School Name: Palmetto Elementary Addition School Type: Elementary Project Type: New/Relief Status: Complete Year: 2000 Attachments: - Final Update
 
- 
        
    School Name: Panther Lake Elementary School Type: Elementary Project Type: New/Relief Status: Construction Year: 2022 Attachments: 
- 
        
    School Name: Pershing School School Type: Middle/K-8 Project Type: Replacement Status: Complete Year: 2019 Attachments: 
- 
        
    School Name: Piedmont Lakes MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Planning Year: 2023 Attachments: 
 School Name: Piedmont Lakes MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Closeout Year: 2022 Attachments: 
 School Name: Piedmont Lakes MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2010 Attachments: 
- 
        
    School Name: Pinar ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2020 Attachments: 
- 
        
    School Name: Pine Hills ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2018 Attachments: 
- 
        
    School Name: Pine Hills Transportation Center School Type: Vocational/Other Project Type: Comprehensive Renovation Status: Complete Year: 2019 Attachments: 
- 
        
    School Name: Pineloch ES School Type: Elementary Project Type: Capital Renewal Status: Complete Year: 2014 Attachments: 
- 
        
    School Name: Pinewood ES School Type: Elementary Project Type: Capital Renewal Status: Complete Year: 2020 Attachments: 
 School Name: Pinewood ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2010 Attachments: 
- 
        
    School Name: Positive Pathways Transition Center School Type: Vocational/Other Project Type: New/Relief Status: Complete Year: 2002 Attachments: 
- 
        
    School Name: Prairie Lake ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2013 Attachments: 
- 
        
    School Name: Princeton ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2012 Attachments: 
 School Name: Princeton ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: Ridgewood Park ES School Type: Elementary Project Type: Capital Renewal Status: Complete Year: 2020 Attachments: 
 School Name: Ridgewood Park ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Riverdale ES School Type: Elementary Project Type: Capital Renewal Status: Complete Year: 2020 Attachments: 
 School Name: Riverdale ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2010 Attachments: 
- 
        
    School Name: Riverside ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2016 Attachments: 
 School Name: Riverside ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: Roberto Clemente MS (former Jackson MS) School Type: Middle/K-8 Project Type: Capital Renewal Status: Design Year: 2023 Attachments: - Multi-System Design Update
- Capital Renewal Final Update
- Chiller Replacement Design Update
- Gym Floor Final Update
 
 School Name: Roberto Clemente MS (former Jackson MS) School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: Robinswood MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2009 Attachments: 
- 
        
    School Name: Rock Lake ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2017 Attachments: 
- 
        
    School Name: Rock Springs ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2013 Attachments: 
- 
        
    School Name: Rolling Hills ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2020 Attachments: 
- 
        
    School Name: Rosemont ES School Type: Elementary Project Type: Capital Renewal Status: Planning Year: 2023 Attachments: 
 School Name: Rosemont ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2011 Attachments: 
- 
        
    School Name: Sadler ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: Sally Ride ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2018 Attachments: 
- 
        
    School Name: Sand Lake ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2005 Attachments: 
- 
        
    School Name: Shenandoah ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2008 Attachments: 
- 
        
    School Name: Shingle Creek ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2014 Attachments: 
- 
        
    School Name: Site 97-E-SE-2 Greenfield School School Type: Elementary Project Type: New/Relief Status: Construction Year: 2025 Attachments: 
- 
        
    School Name: South Creek MS School Type: Middle/K-8 Project Type: New/Relief Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Southwest MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2020 Attachments: 
 School Name: Southwest MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Southwood ES School Type: Elementary Project Type: Capital Renewal Status: Complete Year: 2019 Attachments: 
 School Name: Southwood ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2011 Attachments: 
- 
        
    School Name: Spring Lake ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2014 Attachments: 
- 
        
    School Name: Stone Lakes ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Stonewyck Elementary School Type: Elementary Project Type: New/Relief Status: Construction Year: 2022 Attachments: 
- 
        
    School Name: Summerlake ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2020 Attachments: 
- 
        
    School Name: Sun Blaze ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2013 Attachments: 
- 
        
    School Name: SunRidge ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2012 Attachments: 
- 
        
    School Name: SunRidge MS School Type: Middle/K-8 Project Type: New/Relief Status: Complete Year: 2012 Attachments: 
- 
        
    School Name: Sunrise ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2019 Attachments: 
- 
        
    School Name: Sunset Park ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: Sunshine ES School Type: Elementary Project Type: New/Relief Status: Closeout Year: 2020 Attachments: 
- 
        
    School Name: Tangelo Park ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2016 Attachments: 
- 
        
    School Name: Thornebrooke ES School Type: Elementary Project Type: Capital Renewal Status: Design Year: 2022 Attachments: 
 School Name: Thornebrooke ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2002 Attachments: 
- 
        
    School Name: Three Points ES School Type: Elementary Project Type: Comprehensive Renovation Status: Design Year: 2025 Attachments: 
 School Name: Three Points ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2001 Attachments: 
- 
        
    School Name: Tildenville ES School Type: Elementary Project Type: Capital Renewal Status: Planning Year: 2024 Attachments: 
 School Name: Tildenville ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Timber Creek HS School Type: High Project Type: Comprehensive Renovation Status: Planning Year: 2027 Attachments: 
 School Name: Timber Creek HS School Type: High Project Type: Capital Renewal Status: Complete Year: 2022 Attachments: 
 School Name: Timber Creek HS School Type: High Project Type: New/Relief Status: Complete Year: 2001 Attachments: 
- 
        
    School Name: Timber Lakes ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2008 Attachments: 
- 
        
    School Name: Timber Springs MS School Type: Middle/K-8 Project Type: New/Relief Status: Complete Year: 2017 Attachments: 
 School Name: Timber Springs MS School Type: Elementary Project Type: New/Relief Status: Complete Year: 2017 Attachments: 
- 
        
    School Name: Union Park ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2018 Attachments: 
- 
        
    School Name: Union Park MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Planning Year: 2023 Attachments: 
 School Name: Union Park MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2008 Attachments: 
- 
        
    School Name: University HS School Type: High Project Type: Comprehensive Renovation Status: Complete Year: 2012 Attachments: 
- 
        
    School Name: Ventura ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2017 Attachments: 
 School Name: Ventura ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2016 Attachments: 
- 
        
    School Name: Village Park ES School Type: Elementary Project Type: New/Relief Status: Closeout Year: 2021 Attachments: 
- 
        
    School Name: Vista Lakes ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Vista Pointe ES School Type: Elementary Project Type: New/Relief Status: Closeout Year: 2020 Attachments: 
- 
        
    School Name: Walker MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2012 Attachments: 
- 
        
    School Name: Washington Shores ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2014 Attachments: 
- 
        
    School Name: Washington Shores PLC School Type: Vocational/Other Project Type: Capital Renewal Status: Design Year: 2022 Attachments: 
- 
        
    School Name: Water Spring ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2019 Attachments: 
- 
        
    School Name: Water Spring MS School Type: Middle/K-8 Project Type: New/Relief Status: Construction Year: 2023 Attachments: 
- 
        
    School Name: Waterbridge ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2011 Attachments: 
- 
        
    School Name: Waterford ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2014 Attachments: 
- 
        
    School Name: Wedgefield School School Type: Elementary Project Type: New/Relief Status: Complete Year: 2016 Attachments: 
- 
        
    School Name: Wekiva HS School Type: High Project Type: New/Relief Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: West Creek ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2004 Attachments: 
- 
        
    School Name: West Oaks ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2004 Attachments: 
- 
        
    School Name: West Orange HS School Type: High Project Type: Replacement Status: Complete Year: 2009 Attachments: 
- 
        
    School Name: Westbrooke ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2008 Attachments: 
- 
        
    School Name: Westpointe ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2017 Attachments: 
- 
        
    School Name: Westridge MS School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Design Year: 2025 Attachments: 
 School Name: Westridge MS School Type: Middle/K-8 Project Type: Replacement Status: Complete Year: 2013 Attachments: 
- 
        
    School Name: Wetherbee ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2011 Attachments: 
- 
        
    School Name: Wheatley ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2014 Attachments: 
- 
        
    School Name: Whispering Oak ES School Type: Elementary Project Type: Comprehensive Renovation Status: Design Year: 2025 Attachments: 
 School Name: Whispering Oak ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2005 Attachments: 
- 
        
    School Name: Windermere ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2007 Attachments: 
- 
        
    School Name: Windermere HS School Type: High Project Type: Replacement Status: Construction Year: 2024 Attachments: 
 School Name: Windermere HS School Type: High Project Type: New/Relief Status: Complete Year: 2017 Attachments: 
- 
        
    School Name: Windy Ridge School School Type: Middle/K-8 Project Type: Capital Renewal Status: Planning Year: 2023 Attachments: 
 School Name: Windy Ridge K-8 School Type: Middle/K-8 Project Type: Comprehensive Renovation Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Winegard ES School Type: Elementary Project Type: Replacement Status: Complete Year: 2020 Attachments: 
- 
        
    School Name: Winter Park 9th Grade Center School Type: High Project Type: Comprehensive Renovation Status: Complete Year: 2011 Attachments: 
- 
        
    School Name: Winter Park HS School Type: High Project Type: Comprehensive Renovation Status: Design Year: 2026 Attachments: 
 School Name: Winter Park HS School Type: High Project Type: Capital Renewal Status: Complete Year: 2017 Attachments: 
 School Name: Winter Park HS School Type: High Project Type: Comprehensive Renovation Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Wolf Lake ES School Type: Elementary Project Type: Capital Renewal Status: Complete Year: 2018 Attachments: 
 School Name: Wolf Lake ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Wolf Lake MS School Type: Middle/K-8 Project Type: Capital Renewal Status: Closeout Year: 2022 Attachments: 
 School Name: Wolf Lake MS School Type: Middle/K-8 Project Type: New/Relief Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Wyndham Lakes ES School Type: Elementary Project Type: New/Relief Status: Complete Year: 2006 Attachments: 
- 
        
    School Name: Zellwood ES School Type: Elementary Project Type: Comprehensive Renovation Status: Complete Year: 2012 Attachments: 
 
                         Additional settings for Safari Browser.
                        