School Name: Acceleration East
School Type: High
Project Type: Capital Renewal
Status: Closeout
Year: 2021
Attachments:
School Name: Acceleration East
School Type: High
Project Type: New/Relief
Status: Complete
Year: 2002
Attachments:
School Name: Acceleration West
School Type: High
Project Type: Comprehensive Renovation
Status: Complete
Year: 2020
Attachments:
School Name: Aloma ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2012
Attachments:
School Name: Andover ES
School Type: Elementary
Project Type: Capital Renewal
Status: Design
Year: 2023
Attachments:
School Name: Andover ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2005
Attachments:
School Name: Apopka 9th Grade Center
School Type: High
Project Type: Capital Renewal
Status: Complete
Year: 2021
Attachments:
School Name: Apopka ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2015
Attachments:
School Name: Apopka ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2007
Attachments:
School Name: Apopka MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2011
Attachments:
School Name: Apopka HS
School Type: High
Project Type: Capital Renewal
Status: Planning
Year: 2023
Attachments:
School Name: Apopka HS
School Type: High
Project Type: Replacement
Status: Complete
Year: 2009
Attachments:
School Name: Arbor Ridge K-8
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Construction
Year: 2023
Attachments:
School Name: Arbor Ridge K-8
School Type: Middle/K-8
Project Type: Replacement
Status: Complete
Year: 2013
Attachments:
School Name: Atwater Bay Elementary (Site 47-E-W-4)
School Type: Elementary
Project Type: New/Relief
Status: Construction
Year: 2024
Attachments:
School Name: Audubon Park
School Type: Middle/K-8
Project Type: New/Relief
Status: Complete
Year: 2018
Attachments:
School Name: Audubon Park School
School Type: Middle/K-8
Project Type: New/Relief
Status: Complete
Year: 2018
Attachments:
School Name: Avalon Center for Technical Excellence
School Type: Vocational/Other
Project Type: New/Relief
Status: Complete
Year: 2007
Attachments:
School Name: Avalon ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Design
Year: 2026
Attachments:
School Name: Avalon ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2001
Attachments:
School Name: Avalon MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Construction
Year: 2023
Attachments:
School Name: Avalon MS
School Type: Middle/K-8
Project Type: New/Relief
Status: Complete
Year: 2006
Attachments:
School Name: Azalea Park ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2011
Attachments:
School Name: Baldwin Park ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2007
Attachments:
School Name: Bay Lake ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2016
Attachments:
School Name: Bay Meadows ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2006
Attachments:
School Name: Blankner School
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Construction
Year: 2021
Attachments:
School Name: Blankner School
School Type: Middle/K-8
Project Type: Replacement
Status: Complete
Year: 2002
Attachments:
School Name: Bonneville ES
School Type: Elementary
Project Type: Capital Renewal
Status: Design
Year: 2023
Attachments:
School Name: Bonneville ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2007
Attachments:
School Name: Boone High
School Type: High
Project Type: Comprehensive Renovation
Status: Planning
Year: 2027
Attachments:
School Name: Boone HS
School Type: High
Project Type: Capital Renewal
Status: Closeout
Year: 2022
Attachments:
School Name: Boone HS
School Type: High
Project Type: Capital Renewal
Status: Complete
Year: 2020
Attachments:
School Name: Boone HS
School Type: High
Project Type: Replacement
Status: Complete
Year: 2020
Attachments:
School Name: Boone HS
School Type: High
Project Type: Comprehensive Renovation
Status: Complete
Year: 2020
Attachments:
School Name: Boone HS
School Type: High
Project Type: Replacement
Status: Complete
Year: 2019
Attachments:
School Name: Boone HS
School Type: High
Project Type: Comprehensive Renovation
Status: Complete
Year: 2004
Attachments:
School Name: Bridgewater MS
School Type: Middle/K-8
Project Type: New/Relief
Status: Complete
Year: 2007
Attachments:
School Name: Brookshire ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2013
Attachments:
School Name: Camelot ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Design
Year: 2026
Attachments:
School Name: Camelot ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2001
Attachments:
School Name: Carver MS
School Type: Middle/K-8
Project Type: Replacement
Status: Complete
Year: 2017
Attachments:
School Name: Castle Creek ES
School Type: Elementary
Project Type: Capital Renewal
Status: Construction
Year: 2023
Attachments:
School Name: Castle Creek ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2006
Attachments:
School Name: Castleview ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2019
Attachments:
School Name: Catalina ES
School Type: Elementary
Project Type: Capital Renewal
Status: Construction
Year: 2023
Attachments:
School Name: Catalina ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2007
Attachments:
School Name: Chain of Lakes MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Planning
Year: 2026
Attachments:
School Name: Chain of Lakes MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Construction
Year: 2022
Attachments:
School Name: Chain of Lakes MS
School Type: Middle/K-8
Project Type: New/Relief
Status: Complete
Year: 1999
Attachments:
School Name: Cheney ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2006
Attachments:
School Name: Chickasaw ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2011
Attachments:
School Name: Chickasaw ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2007
Attachments:
School Name: Citrus ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Design
Year: 2026
Attachments:
School Name: Citrus ES
School Type: Elementary
Project Type: Capital Renewal
Status: Complete
Year: 2018
Attachments:
School Name: Citrus ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2000
Attachments:
School Name: Clay Springs ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2015
Attachments:
School Name: College Park MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Design
Year: 2025
Attachments:
School Name: College Park MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Complete
Year: 2018
Attachments:
School Name: College Park MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2010
Attachments:
School Name: Colonial HS
School Type: High
Project Type: Comprehensive Renovation
Status: Design
Year: 2026
Attachments:
School Name: Colonial HS
School Type: High
Project Type: Capital Renewal
Status: Complete
Year: 2019
Attachments:
School Name: Colonial HS
School Type: High
Project Type: Replacement
Status: Complete
Year: 2019
Attachments:
School Name: Colonial HS
School Type: High
Project Type: Comprehensive Renovation
Status: Complete
Year: 2003
Attachments:
School Name: Colonial Ninth Grade Center
School Type: High
Project Type: Capital Renewal
Status: Complete
Year: 2020
Attachments:
School Name: Colonial Ninth Grade Center
School Type: High
Project Type: Comprehensive Renovation
Status: Complete
Year: 2006
Attachments:
School Name: Columbia ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2007
Attachments:
School Name: Conway ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2008
Attachments:
School Name: Conway MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2010
Attachments:
School Name: Corner Lake MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2019
Attachments:
School Name: Cypress Springs ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2012
Attachments:
School Name: Deerwood ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2019
Attachments:
School Name: Dillard Street ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2004
Attachments:
School Name: Discovery MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Closeout
Year: 2022
Attachments:
School Name: Discovery MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Complete
Year: 2021
Attachments:
School Name: Discovery MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2009
Attachments:
School Name: Dommerich ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2010
Attachments:
School Name: Dover Shores ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2018
Attachments:
School Name: Dr. Phillips ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Design
Year: 2025
Attachments:
School Name: Dr. Phillips ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2014
Attachments:
School Name: Dr. Phillips HS
School Type: High
Project Type: Capital Renewal
Status: Construction
Year: 2024
Attachments:
School Name: Dr. Phillips HS
School Type: High
Project Type: Capital Renewal
Status: Design
Year: 2022
Attachments:
School Name: Dr. Phillips HS
School Type: High
Project Type: Comprehensive Renovation
Status: Complete
Year: 2015
Attachments:
School Name: Dream Lake ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2016
Attachments:
School Name: Eagle Creek ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2015
Attachments:
School Name: Eagle's Nest ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2003
Attachments:
School Name: East Lake ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2005
Attachments:
School Name: East River HS
School Type: High
Project Type: New/Relief
Status: Complete
Year: 2009
Attachments:
School Name: Eccleston ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2013
Attachments:
School Name: Edgewater HS
School Type: High
Project Type: Capital Renewal
Status: Closeout
Year: 2022
Attachments:
School Name: Edgewater HS
School Type: High
Project Type: Comprehensive Renovation
Status: Complete
Year: 2011
Attachments:
School Name: Endeavor ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Design
Year: 2026
Attachments:
School Name: Endeavor ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2000
Attachments:
School Name: Engelwood ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2017
Attachments:
School Name: Evans HS
School Type: High
Project Type: Replacement
Status: Complete
Year: 2012
Attachments:
School Name: Forsyth Woods ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2010
Attachments:
School Name: Frangus ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2018
Attachments:
School Name: Freedom MS
School Type: Middle/K-8
Project Type: New/Relief
Status: Complete
Year: 2005
Attachments:
School Name: Freedom HS
School Type: High
Project Type: Capital Renewal
Status: Complete
Year: 2020
Attachments:
School Name: Freedom HS
School Type: High
Project Type: New/Relief
Status: Complete
Year: 2003
Attachments:
School Name: Glenridge MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Closeout
Year: 2022
Attachments:
School Name: Glenridge MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Construction
Year: 2021
Attachments:
School Name: Glenridge MS
School Type: Middle/K-8
Project Type: Replacement
Status: Complete
Year: 2003
Attachments:
School Name: Gotha MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Complete
Year: 2020
Attachments:
School Name: Gotha MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2010
Attachments:
School Name: Hamlin ES
School Type: Elementary
Project Type: New/Relief
Status: Construction
Year: 2022
Attachments:
School Name: Hamlin MS
School Type: Middle/K-8
Project Type: New/Relief
Status: Construction
Year: 2022
Attachments:
School Name: Hiawassee ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2003
Attachments:
School Name: Hidden Oaks ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2018
Attachments:
School Name: Hillcrest ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2018
Attachments:
School Name: Horizon HS
School Type: High
Project Type: New/Relief
Status: Closeout
Year: 2021
Attachments:
School Name: Horizon West MS
School Type: Middle/K-8
Project Type: New/Relief
Status: Complete
Year: 2019
Attachments:
School Name: Howard MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Construction
Year: 2025
Attachments:
School Name: Howard MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Design
Year: 2024
Attachments:
School Name: Howard MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2001
Attachments:
School Name: Hungerford ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2018
Attachments:
School Name: Hungerford ES (OTC - Eatonville)
School Type: Vocational/Other
Project Type: Comprehensive Renovation
Status: Construction
Year: 2023
Attachments:
School Name: Hunter's Creek ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Design
Year: 2025
Attachments:
School Name: Hunter's Creek MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Design
Year: 2025
Attachments:
School Name: Hunter's Creek MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2010
Attachments:
School Name: Independence ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2015
Attachments:
School Name: Innovation High School (Site 50-H-SE-2)
School Type: High
Project Type: New/Relief
Status: Construction
Year: 2024
Attachments:
School Name: Innovation MS
School Type: Middle/K-8
Project Type: New/Relief
Status: Complete
Year: 2017
Attachments:
School Name: Ivey Lane ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2017
Attachments:
School Name: John Young ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2014
Attachments:
School Name: Jones HS
School Type: High
Project Type: Capital Renewal
Status: Construction
Year: 2022
Attachments:
School Name: Jones HS
School Type: High
Project Type: Comprehensive Renovation
Status: Complete
Year: 2005
Attachments:
School Name: Keene's Crossing ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2009
Attachments:
School Name: Kelly Park School
School Type: Middle/K-8
Project Type: New/Relief
Status: Construction
Year: 2022
Attachments:
School Name: Killarney ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2008
Attachments:
School Name: Lake Buena Vista HS
School Type: High
Project Type: New/Relief
Status: Closeout
Year: 2021
Attachments:
School Name: Lake Como School
School Type: Middle/K-8
Project Type: Replacement
Status: Complete
Year: 2018
Attachments:
School Name: Lake Gem ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2019
Attachments:
School Name: Lake George ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2019
Attachments:
School Name: Lake Nona HS
School Type: High
Project Type: New/Relief
Status: Complete
Year: 2009
Attachments:
School Name: Lake Silver ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2014
Attachments:
School Name: Lake Sybelia ES
School Type: Elementary
Project Type: Capital Renewal
Status: Planning
Year: 2021
Attachments:
School Name: Lake Sybelia ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2011
Attachments:
School Name: Lake Weston ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2015
Attachments:
School Name: Lake Whitney ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2015
Attachments:
School Name: Lakemont ES
School Type: Elementary
Project Type: Capital Renewal
Status: Planning
Year: 2023
Attachments:
School Name: Lakemont ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2008
Attachments:
School Name: Lakeview MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Design
Year: 2026
Attachments:
School Name: Lakeview MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Construction
Year: 2022
Attachments:
School Name: Lakeview MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2005
Attachments:
School Name: Lakeville ES
School Type: Elementary
Project Type: Capital Renewal
Status: Complete
Year: 2020
Attachments:
School Name: Lakeville ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2010
Attachments:
School Name: Lancaster ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2013
Attachments:
School Name: Laureate Park ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2017
Attachments:
School Name: Lawton Chiles ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Planning
Year: 2026
Attachments:
School Name: Lawton Chiles ES
School Type: Elementary
Project Type: Capital Renewal
Status: Closeout
Year: 2022
Attachments:
School Name: Lawton Chiles ES
School Type: Elementary
Project Type: Capital Renewal
Status: Complete
Year: 2020
Attachments:
School Name: Lawton Chiles ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 1999
Attachments:
School Name: Legacy MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Design
Year: 2023
Attachments:
School Name: Legacy MS
School Type: Middle/K-8
Project Type: New/Relief
Status: Complete
Year: 2005
Attachments:
School Name: Liberty MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Closeout
Year: 2022
Attachments:
School Name: Liberty MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2007
Attachments:
School Name: Little River ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2014
Attachments:
School Name: Lockhart ES
School Type: Elementary
Project Type: Capital Renewal
Status: Complete
Year: 2016
Attachments:
School Name: Lockhart MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Planning
Year: 2023
Attachments:
School Name: Lockhart MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2010
Attachments:
School Name: Lovell ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2015
Attachments:
School Name: Site 130-E-SE-2
School Type: Elementary
Project Type: New/Relief
Status: Construction
Year: 2025
Attachments:
School Name: Luminary Middle School (Site 129-M-SE-2)
School Type: Middle/K-8
Project Type: New/Relief
Status: Construction
Year: 2024
Attachments:
School Name: Magnolia School/Silver Pines Academy K-12 Learning Center
School Type: Vocational/Other
Project Type: Replacement
Status: Closeout
Year: 2021
Attachments:
School Name: Maitland MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2010
Attachments:
School Name: Maxey ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2018
Attachments:
School Name: McCoy ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2005
Attachments:
School Name: Meadow Woods ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2017
Attachments:
School Name: Meadow Woods MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Closeout
Year: 2021
Attachments:
School Name: Meadowbrook MS
School Type: Middle/K-8
Project Type: Replacement
Status: Complete
Year: 2006
Attachments:
School Name: Memorial MS
School Type: Middle/K-8
Project Type: Replacement
Status: Complete
Year: 2009
Attachments:
School Name: Metrowest ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2011
Attachments:
School Name: Metrowest Primary Learning Center
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 1999
Attachments:
School Name: Millennia ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2006
Attachments:
School Name: Millennia Gardens ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2016
Attachments:
School Name: Mollie Ray ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2017
Attachments:
School Name: Moss Park ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2007
Attachments:
School Name: Northlake Park Community School
School Type: Elementary
Project Type: Capital Renewal
Status: Complete
Year: 2020
Attachments:
School Name: Northlake Park Community School
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 1999
Attachments:
School Name: Northlake Park ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Construction
Year: 2026
Attachments:
School Name: Oak Hill ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2017
Attachments:
School Name: Oak Ridge HS
School Type: High
Project Type: Comprehensive Renovation
Status: Design
Year: 2025
Attachments:
School Name: Oak Ridge HS
School Type: High
Project Type: Replacement
Status: Complete
Year: 2013
Attachments:
School Name: Oakshire ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Planning
Year: 2026
Attachments:
School Name: Oakshire ES
School Type: Elementary
Project Type: Capital Renewal
Status: Complete
Year: 2020
Attachments:
School Name: Oakshire ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 1999
Attachments:
School Name: Ocoee ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2014
Attachments:
School Name: Ocoee MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Planning
Year: 2025
Attachments:
School Name: Ocoee MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Closeout
Year: 2022
Attachments:
School Name: Ocoee MS
School Type: Middle/K-8
Project Type: Replacement
Status: Complete
Year: 2001
Attachments:
School Name: Ocoee HS
School Type: High
Project Type: Capital Renewal
Status: Planning
Year: 2023
Attachments:
School Name: Ocoee HS
School Type: High
Project Type: New/Relief
Status: Complete
Year: 2005
Attachments:
School Name: OCPS Academic Center for Excellence (ACE)
School Type: Middle/K-8
Project Type: New/Relief
Status: Complete
Year: 2017
Attachments:
School Name: Odyssey MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Complete
Year: 2019
Attachments:
School Name: Odyssey MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Complete
Year: 2017
Attachments:
School Name: Odyssey MS
School Type: Middle/K-8
Project Type: New/Relief
Status: Complete
Year: 2001
Attachments:
School Name: Olympia HS
School Type: High
Project Type: Comprehensive Renovation
Status: Planning
Year: 2027
Attachments:
School Name: Olympia HS
School Type: High
Project Type: Capital Renewal
Status: Complete
Year: 2020
Attachments:
School Name: Olympia HS
School Type: High
Project Type: Comprehensive Renovation
Status: Complete
Year: 2007
Attachments:
School Name: Olympia HS
School Type: High
Project Type: New/Relief
Status: Complete
Year: 2001
Attachments:
School Name: Orange Center ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Design
Year: 2023
Attachments:
School Name: Orange Technical College (Formerly OTC - Orlando)
School Type: Vocational/Other
Project Type: Comprehensive Renovation
Status: Construction
Year: 2023
Attachments:
School Name: Orlo Vista ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2004
Attachments:
School Name: OTC - Apopka Campus (Site 204-AE-N-7)
School Type: Vocational/Other
Project Type: Capital Renewal
Status: Design
Year: 2022
Attachments:
School Name: OTC - East Campus (Site 512-T-E-1)
School Type: Vocational/Other
Project Type: Replacement
Status: Construction
Year: 2024
Attachments:
School Name: OTC - South Campus (Formerly Mid-Florida Tech)
School Type: Vocational/Other
Project Type: Comprehensive Renovation
Status: Design
Year: 2025
Attachments:
School Name: OTC West Campus (Site 73-T-W-7) Formerly Westside Tech
School Type: Vocational/Other
Project Type: Replacement
Status: Construction
Year: 2024
Attachments:
School Name: Palm Lake ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2010
Attachments:
School Name: Palmetto ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Planning
Year: 2026
Attachments:
School Name: Palmetto Elementary Addition
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2000
Attachments:
School Name: Panther Lake Elementary
School Type: Elementary
Project Type: New/Relief
Status: Construction
Year: 2022
Attachments:
School Name: Pershing School
School Type: Middle/K-8
Project Type: Replacement
Status: Complete
Year: 2019
Attachments:
School Name: Piedmont Lakes MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Planning
Year: 2023
Attachments:
School Name: Piedmont Lakes MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Closeout
Year: 2022
Attachments:
School Name: Piedmont Lakes MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2010
Attachments:
School Name: Pinar ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2020
Attachments:
School Name: Pine Hills ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2018
Attachments:
School Name: Pine Hills Transportation Center
School Type: Vocational/Other
Project Type: Comprehensive Renovation
Status: Complete
Year: 2019
Attachments:
School Name: Pineloch ES
School Type: Elementary
Project Type: Capital Renewal
Status: Complete
Year: 2014
Attachments:
School Name: Pinewood ES
School Type: Elementary
Project Type: Capital Renewal
Status: Complete
Year: 2020
Attachments:
School Name: Pinewood ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2010
Attachments:
School Name: Positive Pathways Transition Center
School Type: Vocational/Other
Project Type: New/Relief
Status: Complete
Year: 2002
Attachments:
School Name: Prairie Lake ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2013
Attachments:
School Name: Princeton ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2012
Attachments:
School Name: Princeton ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2007
Attachments:
School Name: Ridgewood Park ES
School Type: Elementary
Project Type: Capital Renewal
Status: Complete
Year: 2020
Attachments:
School Name: Ridgewood Park ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2006
Attachments:
School Name: Riverdale ES
School Type: Elementary
Project Type: Capital Renewal
Status: Complete
Year: 2020
Attachments:
School Name: Riverdale ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2010
Attachments:
School Name: Riverside ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2016
Attachments:
School Name: Riverside ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2007
Attachments:
School Name: Roberto Clemente MS (former Jackson MS)
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Design
Year: 2023
Attachments:
School Name: Roberto Clemente MS (former Jackson MS)
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2007
Attachments:
School Name: Robinswood MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2009
Attachments:
School Name: Rock Lake ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2017
Attachments:
School Name: Rock Springs ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2013
Attachments:
School Name: Rolling Hills ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2020
Attachments:
School Name: Rosemont ES
School Type: Elementary
Project Type: Capital Renewal
Status: Planning
Year: 2023
Attachments:
School Name: Rosemont ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2011
Attachments:
School Name: Sadler ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2007
Attachments:
School Name: Sally Ride ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2018
Attachments:
School Name: Sand Lake ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2005
Attachments:
School Name: Shenandoah ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2008
Attachments:
School Name: Shingle Creek ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2014
Attachments:
School Name: Site 97-E-SE-2 Greenfield School
School Type: Elementary
Project Type: New/Relief
Status: Construction
Year: 2025
Attachments:
School Name: South Creek MS
School Type: Middle/K-8
Project Type: New/Relief
Status: Complete
Year: 2006
Attachments:
School Name: Southwest MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2020
Attachments:
School Name: Southwest MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2006
Attachments:
School Name: Southwood ES
School Type: Elementary
Project Type: Capital Renewal
Status: Complete
Year: 2019
Attachments:
School Name: Southwood ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2011
Attachments:
School Name: Spring Lake ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2014
Attachments:
School Name: Stone Lakes ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2006
Attachments:
School Name: Stonewyck Elementary
School Type: Elementary
Project Type: New/Relief
Status: Construction
Year: 2022
Attachments:
School Name: Summerlake ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2020
Attachments:
School Name: Sun Blaze ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2013
Attachments:
School Name: SunRidge ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2012
Attachments:
School Name: SunRidge MS
School Type: Middle/K-8
Project Type: New/Relief
Status: Complete
Year: 2012
Attachments:
School Name: Sunrise ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2019
Attachments:
School Name: Sunset Park ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2007
Attachments:
School Name: Sunshine ES
School Type: Elementary
Project Type: New/Relief
Status: Closeout
Year: 2020
Attachments:
School Name: Tangelo Park ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2016
Attachments:
School Name: Thornebrooke ES
School Type: Elementary
Project Type: Capital Renewal
Status: Design
Year: 2022
Attachments:
School Name: Thornebrooke ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2002
Attachments:
School Name: Three Points ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Design
Year: 2025
Attachments:
School Name: Three Points ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2001
Attachments:
School Name: Tildenville ES
School Type: Elementary
Project Type: Capital Renewal
Status: Planning
Year: 2024
Attachments:
School Name: Tildenville ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2006
Attachments:
School Name: Timber Creek HS
School Type: High
Project Type: Comprehensive Renovation
Status: Planning
Year: 2027
Attachments:
School Name: Timber Creek HS
School Type: High
Project Type: Capital Renewal
Status: Complete
Year: 2022
Attachments:
School Name: Timber Creek HS
School Type: High
Project Type: New/Relief
Status: Complete
Year: 2001
Attachments:
School Name: Timber Lakes ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2008
Attachments:
School Name: Timber Springs MS
School Type: Middle/K-8
Project Type: New/Relief
Status: Complete
Year: 2017
Attachments:
School Name: Timber Springs MS
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2017
Attachments:
School Name: Union Park ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2018
Attachments:
School Name: Union Park MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Planning
Year: 2023
Attachments:
School Name: Union Park MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2008
Attachments:
School Name: University HS
School Type: High
Project Type: Comprehensive Renovation
Status: Complete
Year: 2012
Attachments:
School Name: Ventura ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2017
Attachments:
School Name: Ventura ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2016
Attachments:
School Name: Village Park ES
School Type: Elementary
Project Type: New/Relief
Status: Closeout
Year: 2021
Attachments:
School Name: Vista Lakes ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2006
Attachments:
School Name: Vista Pointe ES
School Type: Elementary
Project Type: New/Relief
Status: Closeout
Year: 2020
Attachments:
School Name: Walker MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2012
Attachments:
School Name: Washington Shores ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2014
Attachments:
School Name: Washington Shores PLC
School Type: Vocational/Other
Project Type: Capital Renewal
Status: Design
Year: 2022
Attachments:
School Name: Water Spring ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2019
Attachments:
School Name: Water Spring MS
School Type: Middle/K-8
Project Type: New/Relief
Status: Construction
Year: 2023
Attachments:
School Name: Waterbridge ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2011
Attachments:
School Name: Waterford ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2014
Attachments:
School Name: Wedgefield School
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2016
Attachments:
School Name: Wekiva HS
School Type: High
Project Type: New/Relief
Status: Complete
Year: 2007
Attachments:
School Name: West Creek ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2004
Attachments:
School Name: West Oaks ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2004
Attachments:
School Name: West Orange HS
School Type: High
Project Type: Replacement
Status: Complete
Year: 2009
Attachments:
School Name: Westbrooke ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2008
Attachments:
School Name: Westpointe ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2017
Attachments:
School Name: Westridge MS
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Design
Year: 2025
Attachments:
School Name: Westridge MS
School Type: Middle/K-8
Project Type: Replacement
Status: Complete
Year: 2013
Attachments:
School Name: Wetherbee ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2011
Attachments:
School Name: Wheatley ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2014
Attachments:
School Name: Whispering Oak ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Design
Year: 2025
Attachments:
School Name: Whispering Oak ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2005
Attachments:
School Name: Windermere ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2007
Attachments:
School Name: Windermere HS
School Type: High
Project Type: Replacement
Status: Construction
Year: 2024
Attachments:
School Name: Windermere HS
School Type: High
Project Type: New/Relief
Status: Complete
Year: 2017
Attachments:
School Name: Windy Ridge School
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Planning
Year: 2023
Attachments:
School Name: Windy Ridge K-8
School Type: Middle/K-8
Project Type: Comprehensive Renovation
Status: Complete
Year: 2006
Attachments:
School Name: Winegard ES
School Type: Elementary
Project Type: Replacement
Status: Complete
Year: 2020
Attachments:
School Name: Winter Park 9th Grade Center
School Type: High
Project Type: Comprehensive Renovation
Status: Complete
Year: 2011
Attachments:
School Name: Winter Park HS
School Type: High
Project Type: Comprehensive Renovation
Status: Design
Year: 2026
Attachments:
School Name: Winter Park HS
School Type: High
Project Type: Capital Renewal
Status: Complete
Year: 2017
Attachments:
School Name: Winter Park HS
School Type: High
Project Type: Comprehensive Renovation
Status: Complete
Year: 2006
Attachments:
School Name: Wolf Lake ES
School Type: Elementary
Project Type: Capital Renewal
Status: Complete
Year: 2018
Attachments:
School Name: Wolf Lake ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2006
Attachments:
School Name: Wolf Lake MS
School Type: Middle/K-8
Project Type: Capital Renewal
Status: Closeout
Year: 2022
Attachments:
School Name: Wolf Lake MS
School Type: Middle/K-8
Project Type: New/Relief
Status: Complete
Year: 2006
Attachments:
School Name: Wyndham Lakes ES
School Type: Elementary
Project Type: New/Relief
Status: Complete
Year: 2006
Attachments:
School Name: Zellwood ES
School Type: Elementary
Project Type: Comprehensive Renovation
Status: Complete
Year: 2012
Attachments: